p1060769Work on the Art Space has continued all fall.

In-floor radiant heating was installed in the lower level, and a furnace to supply all the hot water needs of the building is in place. The standing-seam metal roof was fabricated on-site, with our own machine, and installed by the contractor. Now that the space is weather-tight, work is commencing on the electrical system, the heating on the second floor, and the installation of the garage doors into the woodworking and pottery studios.

This coming spring, the siding can be installed, as well as insulation and dry wall inside. Then painting, flooring and finishing work can be done. This is the type of work that work groups can do – if you are interested, please call Mary Romano at 845-786-5674 to inquire about available dates. If there are enough “hands on deck” we can foresee a completion date sometime in 2014.